Works
-
Dam and Structure Survey of Muer, Tiu Kulit, Kengkang, Kempo, Olat Rawa, Bayan and Pemasar Dam (Paket SID. C-9)
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
No Comments
-
Information System Development to Utilize Spatial Planning at Area of Floods Caused and Area of Pond in Jabotabek and Bopunjur
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
National Policy Study of Lake and Small Lake Utilization
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Survey, Investigation and Design, Land Development and Tertiary Canal (TC) of Batang Hari Irrigation Project, BHIP Package LCB-5 (Lot-3), JBIC No. IP-504
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Water Resources Existing Facilities Rehabilitation and Capacity Improvement Project, JBIC No. IP-510
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Feasibility Study of Kluet Hydro Electric Power Plant (2 x 60 MW)
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Feasibility Study of Buleleng Micro Hydro Electric Power Plant (2x 600kV)
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Feasibility Study of Genyem Hydro Electric Power Plant
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Feasibility Study of Relocation, Recondition Combined Cycle PLTG unit 4 & 5 Priok to Pemaron, Bali and Combined Cycle PLTG unit 3 & 4 in Pesanggaran, Bali
- November 24, 2023
- Posted by: Biyan Wardana
- Categories:
-
Construction Supervision of Nagan Raya Coal Fired Steam Power Plant (2 x 110 MW)
- November 24, 2023
- Posted by: Biyan Wardana
- Categories: